Chugoku電力公司
成立一年
1951年階段
首次公開募股 |上市上市日期
11/1/1952缺失:Chugoku電力公司的產品演示和案例研究
促進你的產品提供技術買家。
達到1000年代的買家使用CB的見解來確定供應商,演示產品,188bet游戏做出購買決定。
缺失:Chugoku電力公司的產品&微分器
不要讓你的產品被跳過。買家使用我們的供應商排名名單公司和驅動(rfp)請求建議。
最新的Chugoku電力公司新聞
2022年6月6日
第一個日本,沸水型反應堆的清除重啟2022年6月6日分享日本島根縣的州長批準重啟單元二Chugoku電力公司的島核電站。他批準標誌著完成過程來獲得當地社區的同意789兆瓦沸水反應堆(BWR)恢複操作。島核電站(圖片:Chugoku)在6月2日在縣議會會議上,島根縣州長達Maruyama日本共同社援引說“我明白(核電)扮演某些角色”在日本的能源政策。他補充說:“我認為目前重啟是不可避免的,所以我決定接受它。”The Asahi Shimbun reported that Maruyama noted that "if the reactor does not restart, the impact on the local economy will be huge." Revised regulations were announced by Japan's Nuclear Regulation Authority (NRA) in July 2013, which must be met before reactors can receive permission to restart. These set out requirements for plants to be able to respond to a variety of natural phenomena as well as establish new measures to mitigate the effects of severe accidents, such as reactor core damage caused by beyond design basis events. Chugoku applied to the NRA in December 2013 for inspections to verify whether measures taken at Shimane unit 2 - which has been offline since 27 January 2012 - meet the new safety standards. Chugoku has constructed a 15-metre-high sea wall to protect the plant from tsunamis and made preparations for a potential eruption of the Mount Sanbe volcano. It aims to complete seismic reinforcement and other works for Shimane 2 by the end of February 2023. In June 2021, the NRA approved a draft report finding that Shimane 2 meets the revised regulatory standards. The assessment of the unit was officially adopted in September after a public comment period and other procedures, clearing the way for it to resume operation, pending local consent. Shimane 2 became the 17th Japanese reactor to pass the regulator's safety screenings and the fifth BWR - the same type as those at the Fukushima Daiichi plant - to receive regulatory approval to restart. In February this year, the city of Matsue, which hosts the plant, gave its consent for the unit to restart. The cities of Izumo, Yasugi and Unnan - all within 30 kilometres from the plant - have also agreed to its restart. The Shimane prefectural assembly had already decided on a policy to approve the restart, leaving the governor's approval the final consent required for the unit to resume operation. The Japanese reactors restarted so far have been pressurised water reactors. Shimane 2 is likely to be the country's first BWR to be restarted. Shimane unit 1 - a 460 MWe BWR that started commercial operation in March 1974 - is currently being decommissioned. In August 2018, Chugoku initiated the regulatory process for starting up Shimane 3, a new 1373 MWe advanced boiling water reactor nearing completion. Researched and written by World Nuclear News Related topics
Chugoku電力公司常見問題(FAQ)
Chugoku電力公司是何時成立的?
Chugoku電力公司成立於1951年。
Chugoku電力公司的總部在哪裏?
Chugoku電力公司的總部位於4-33 Komachi, Naka-ku,廣島。
是什麼Chugoku電力公司的最新一輪融資?
Chugoku電力公司的最新一輪融資上市。
發現正確的解決方案為您的團隊
CB見解188bet游戏科技市場情報平台分析數百萬數據點在供應商、產品、合作關係,專利來幫助您的團隊發現他們的下一個技術解決方案。